The fifth day and they have closed off the "valve." Those big tubes at the top of the damn are connected to hugh pumps. Within a day or so, they should start flowing. The 2nd picture is Lakewood Bay. The docks are about 5-6 ft. above the water.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment